commissioning some of the work prepared
One, Saw hydraulic oil should be added on the foot, sliding and rotating parts with a layer of oil.
Second, band sawing machine fitted construction tools with saws, adjustable tension device (rotating saw frame on the left handle) the saw band tension reached a suitable level, while adjusting ran into a good trip switch contact block of iron, in the open state.Third, the cooling water tank Riga enough coolant.Fourth, do more preparatory work, plug in the power, ground must be standard, reliable, turn on the power switch (in the electrical control box), start sawing test, as stated on the wood drill bits label in accordance with rotation correction wiring, while listening to its sound is normal . During operation so that saw bow down automatically with the saw table to drop below 0.5 ~ 1mm, limit switch head hit hit the block automatically rise, when it reaches the limit position height is automatically shut down, three successive experiments. Tension adjustment during operation device in a relaxed state, so leave the hit limit switch contact blocks power off, continuous experiment three times.Fifth, check up, down cylinder device, check the saw bow lift and fall, is reliable and flexible.Six, check the cutting discs clamp, loosen cylinder device, check whether reliable clamping clamping, relaxation is flexible.Seven, adjust the speed control knob, transferred a file (low speed) operation, then governor to two files (high-speed) operation, repeated the experiment three times.Eight, the main motor power switch is turned on, the pump accordingly and start the cooling system to normal operation. Commissioning valves, check the coolant is smooth.Nine, do more preparatory work, the load clamp lock, sawing trial.
没有评论:
发表评论